R&D Advisory & Fractional VP R&D
Your engineering team grew, but delivery got slower. I help figure out why, what actually needs to change, and what can wait. Hire a fractional VP R&D for the months you need one, without the full-time hire.
- Who this is for
- Founders and CTOs at seed to Series A, usually somewhere between five and twenty-five engineers. Or earlier, when there's nobody senior enough to push back on the technical calls and a full-time VP doesn't make sense yet. I'm based in Israel and work with teams here and remotely across Europe and the US.
This sounds familiar if…
- Engineering feels slower than it should, and nobody can say exactly why.
- The team grew quickly. The structure around it didn't.
- You're the bottleneck. Decisions wait for you.
- Delivery is inconsistent. Some quarters land, some don't.
- Ownership is unclear, and work falls between people.
- Technical debt has stopped being theoretical.
- You're starting to wonder whether it's time to hire a VP R&D.
One or two of these is normal. Four or five usually means the cause sits underneath all of them.
How I help
Two shapes, and most engagements move between them. Advisory is the lighter one: we talk regularly, you bring the hard calls, I help you make them and tell you when I think you're wrong.
Embedded is the heavier one. I take the VP R&D seat part-time: strategy, architecture, hiring, delivery, and the day-to-day of a team that ships. Until you're ready to fill the seat properly, or until you decide you don't need to yet.
Most teams don't need more process. They need clearer ownership and fewer people waiting on one person.
R&D Health Check
Start with an R&D Health Check
A short, focused look at how engineering actually works here. Not an audit in the uncomfortable sense. I talk to people, read some code, watch how work moves, and tell you what I see.
What I look at
- Team structure and who owns what
- How work moves from idea to production
- Delivery: what ships, what slips, and why
- Architecture at a high level
- Technical debt that's costing you now
- Tooling and the friction around it
- Hiring, seniority gaps, and what you're missing
- Engineering culture, as practiced rather than as written
What you get back
- What's working, and worth protecting.
- The biggest problems, and why they're happening. The cause rather than the symptom.
- What to fix in what order.
- What to change over the next 30, 60, and 90 days.
- How long
- One to two weeks
- Language
- English or Hebrew
- Where
- Tel Aviv, or remote
No price listed, because the scope varies more than I'd like to pretend. Tell me your team size and what's hurting, and I'll give you a number.
Where this usually goes.
Take the letter instead.
I've written about this.
Not marketing pieces. Just the parts I was still thinking about after work.
Show 4 moreShow fewer
Two other things I get called about.
Tell me what's going on.
A few sentences is plenty. What's happening, roughly how big the team or organization is, and the thing you'd fix first if you had the time.